Manufacturing Process of Safety Bollards
- Steel cage is prepared with 8 MM TMT Bars
- Prepare Concrete Mixture in M30 grade.
- Steel Cage is inserted in moulds
- Assembling of Moulds
- Filling moulds with concrete mixture
- Settling mixture in moulds with the help of Vibration compaction method using FRP for impeccable finish.
- Demoulding
- Finish with Homogeneous layer of cement plaster 1:1 (Cement & Sand)
- Curing
First steel reinforcement cage is prepared with 8MM TMT Bars. After that concrete mixture is prepared in M30 grade. Mixing water in the cement, sand and stone will form a paste that will bind the material until the mixture hardens. Once the mixture is ready Mould are assembled and steel cage is inserted in moulds and concrete mixture is fed into the moulds and settle the mixture properly with vibration table which is called vibration compaction method using plastic moulds for impeccable finish. After a while moulds are removed and Bollards are Finished with Homogeneous layer of cement plaster 1:1 (Cement & Sand) and after that submersed in the curing tank for 7 days
For More information:
Call Us: +91-9999012399
Email Us: info@brhcpipes.com
Visit Us: www.brhcpipes.com